Site Model 3.0

Upon further reflection it become apparent to us that we have not allocated adequate space for our basement bathhouse proposals. Currently the basement space of the WW building is level with the ground/courtyard, however the ceiling height in this space is limited and it would be ideal to excavate down expanding the space.

This requires the site model to be adaptable based on each of our personal designs. Assuming that majority of our group will be expanding the space we need to cut out a void of where the basement will sit to allow for this.

Ideally, we should have taken this concept into consideration when we were laser cutting. This will mean that the adjustments will have to be cut by hand, should be okay. I’ll add a progress photo below